Road Construction

The construction of a new road – whether from asphalt or concrete – requires the production of an excellently bonded pavement structure, beginning with a stable base layer and going all the way to a precisely levelled surface course.

What are the most important criteria to be considered? What methods need to be applied? What machines used?
The base layer of a road lays the foundation for the upper pavement structure. It must offer excellent bearing capacity, be capable of withstanding a broad range of different climatic conditions, and remain functional over several decades.